Overtime vs. Multiple Shifts: Event Staffing Math
For multi-day events, conferences, and festivals, one of your biggest scheduling decisions is whether to work staff overtime across multiple days or split the work across multiple shifts and staff members. This choice impacts both costs and quality. Overtime can be cheaper in specific scenarios, but split shifts often provide better service, fresher staff, and avoid compliance complications. Understanding the math helps you make the right choice for each event.
The Economics of Overtime vs. Split Shifts
The math is straightforward but counterintuitive. Overtime costs 50% more than regular time (federally mandated for time over 40 hours weekly). So paying one person to work 50 hours includes 40 hours at regular rate plus 10 hours at 1.5x rate. In contrast, splitting that work across two people means both work 25 hours at regular rate, with no overtime premium.
ONE PERSON, 50 HOURS/WEEK:
40 hours × $20/hr = $800
10 hours × $30/hr = $300
Total: $1,100
TWO PEOPLE, 25 HOURS EACH:
25 hours × $20/hr × 2 = $1,000
Total: $1,000
Savings with split shifts: $100 (9% savings)
This comparison shows that split shifts can actually save money once you exceed 40 hours weekly, even when factoring in additional overhead like separate equipment, training, or supervision. The break-even point depends on your overtime rate and staffing structure, but generally, split shifts save 5-15% on labor costs for work exceeding 40 hours weekly.
Multi-Day Events: When Overtime Costs Spike
Multi-day events (conferences, festivals, trade shows) create the highest overtime costs because staff inevitably exceed 40 hours weekly. A 3-day event running 10 hours daily equals 30 hours—still under 40. But a 4-day event with 10-hour days totals 40 hours, and any additional hours trigger overtime. A 5-day event with 10-hour days equals 50 hours, with 10 hours at overtime rates.
4-DAY SETUP/BREAKDOWN CREW:
Option 1: One crew working 4 days, 10 hours daily = 40 hours
Cost: 40 × $22 = $880 (no overtime)
Option 2: Two crews, each 2 days, 10 hours daily = 20 hours each
Cost: 20 × $22 × 2 = $880 (same cost) (See also: Wage & Hour Compliance for Event Staff Scheduling.)
Option 3: One crew working 5 days, 8 hours daily = 40 hours (includes day for contingency)
Cost: 40 × $22 = $880 (still no overtime)
For a 5-day event where one crew works all 5 days, 10 hours daily (50 total hours):
Cost: (40 × $22) + (10 × $33) = $880 + $330 = $1,210
Using two crews, each working 2.5 days: Cost = (25 × $22 × 2) = $1,100. Savings: $110 (9%).
When Overtime is Actually Cheaper
Overtime becomes relatively cheaper when you factor in shift minimums, per-shift surcharges, or training costs. If each staff member requires a 4-hour minimum shift, and you only need 30 hours of work, one person working 30 hours (7.5 shifts minimum, so likely 8 shifts = 32 hours) might cost less than hiring two people at 4-hour minimums each (16+ hours).
Similarly, if your staffing provider charges per-shift fees ($25 per shift, for example), multiple shifts create multiple per-shift charges. One person working 6 shifts might generate $150 in shift fees. Two people working 3 shifts each generate $300 in shift fees. These administrative charges sometimes make overtime cheaper than splitting staff.
Overtime is also relatively cheaper when staff are highly specialized and hard to replace. Hiring two experienced event managers for a 50-hour event might be harder than keeping one experienced manager who knows your systems and clients, even if they work overtime.
The Hidden Costs of Overtime
Don't factor only direct pay into your calculation. Fatigued staff working excessive hours perform worse: slower setup, more errors in registration or event execution, higher likelihood of mistakes. A tired bartender oversells or undercharges. Exhausted setup crew takes longer to complete tasks. These quality costs can exceed the 50% overtime wage premium.
Additionally, excessive overtime creates staff retention problems. People working 50-60 hour weeks at events often burn out and leave the industry. If you've invested in training experienced staff, losing them due to burnout is expensive. Staff working reasonable hours (25-30 per week) are more likely to stay long-term, providing stability and knowledge retention.
Overtime also creates compliance risk. Violation of wage laws around overtime calculations, improper break provisions during long shifts, or misclassification issues expose you to audits and back-pay claims. The potential liability from a wage claim far exceeds the arithmetic cost difference between overtime and split shifts. (See also: Cutting Event Staffing Costs Without Cutting Quality.)
Service Quality and Attendee Experience
Fresh staff provide better service than exhausted staff. A registration person working 20 fresh hours delivers better customer service than one working 50 tired hours. Booth staff working split shifts show more energy and engagement with visitors than those grinding through their 10th consecutive hour. For any event where guest experience quality matters, split shifts improve satisfaction scores, sponsorship value, and repeat attendance.
Some roles are particularly sensitive to fatigue: customer service, brand ambassador, security, and technical support all perform significantly worse when fatigued. For these roles, split shifts are often worth the modest cost premium purely for quality reasons.
Compliance and Legal Considerations
Ensure overtime calculations are accurate and documented. Some states have daily overtime rules (overtime after 8 hours daily) in addition to federal weekly overtime. California, for example, requires overtime after 8 hours daily, meaning someone working a 10-hour shift for 5 consecutive days accumulates significant overtime. Understanding state-specific rules prevents violations.
Document all hours worked, breaks taken, and overtime eligibility. Disputes over whether staff should have been classified as overtime-eligible, or whether overtime was properly paid, can result in costly wage claims. Proper documentation protects you if audit or dispute arises.
Practical Decision Framework
Use split shifts when: your event exceeds 40 hours weekly, you can easily recruit additional staff, service quality matters significantly, roles are customer-facing, and your staffing provider charges minimal per-shift surcharges.
Use overtime when: work is under 40 hours weekly, you have specialized, hard-to-replace staff, shift minimums make hiring additional people inefficient, work is behind-the-scenes (setup/breakdown) where quality variance matters less, and you can keep individual staff at reasonable hours (under 50 total).
For most multi-day events, some combination works best: split the core event staff who interact with guests, but keep smaller specialized crews (setup/breakdown, technical) working extended hours if feasible. This balances cost, quality, and logistics.